0 items
COMING SOON – THE BOSS – ZONE 1 – (GRP) TOWER!
As part of our continued investment and expansion, Broughton Plant Hire & Sales are bringing the Boss zone 1 Glass Reinforced Polymer (GRP) tower scaffold to the market.
- Manufactured from Glass Reinforced Polymer which is non-conductive, non-sparking, non-corrosive and non-oxidising for a range of applications
- Colour coded hook – ensures the braces are easy to identify
- Improved frame design enables quick assembly
- Frame collar encapsulates the GRP tube to eliminate accidental damage during assembly and Transportation
- Frame interlocking clip is retained in the collar, thereby reducing wear and tear
- 30kg side loading as required by EN1004
- Maximum platform safe working load of 220kg
Email or call for more information:
✉️ [email protected]
📞01708 383350
🗣 Live chat – speak with a member of the team here:
https://www.broughtonplanthire.co.uk/how-to-hire/
#GRPTower #FleetInvestment #CompanyGrowth #PlantHireUK #HealthAndSafety #ConstructionPlant #ServicingPlantEquipment #LowLevelAccess #WernerCo #BoSS #Romford #BroughtonPlantHireAndSales
Related Posts
🎖️ Armed Forces Day – 28th June
Today, we honour the dedication, bravery, and sacrifice of our Armed Forces, past and present. Broughton Plant Hire & Sales Ltd stands in appreciation of those who serve in the Army, Navy, Air Force, and Marines, and we recognise the invaluable contributions they make in protecting and supporting our nation. THANK YOU! To all service members and their families. Your
Read More
📢 It’s Official – Our Manchester Depot Opens 7th July 2025! 🏗️
Exciting times here now we can confirm the opening date for our brand-new Manchester depot, opening Monday 7th July 2025! 🎉 Behind the scenes, we’ve been building stock, setting up the site, and making sure everything is ready to deliver the reliable service and quality Broughton is known for. CONTACT THE DEPOT: 📞 0161 870 7700 📍 Unit 7 Shield
Read More